A clipping of my model: What I want: (1) replacing the empty "m_properties" instance with the data of the "m_properties" instance from "Content Pane" (2) replacing the "title" and the "unit" entries AFTER (1) The problem is, that Tersus actually does (2) BEFORE (1). Don't know why. IMHO it makes no sense to replace the whole "Database Record" as last step in such a situation instead it should be done first of all steps. Can I control the execution order? Or should it be modeled different? ciao, kkg
A clipping of my model:
What I want:
(1) replacing the empty "m_properties" instance with the data of the "m_properties" instance from "Content Pane"
(2) replacing the "title" and the "unit" entries AFTER (1)
The problem is, that Tersus actually does (2) BEFORE (1). Don't know why.
IMHO it makes no sense to replace the whole "Database Record" as last step in such a situation instead it should be done first of all steps.
Can I control the execution order? Or should it be modeled different?
ciao, kkg
To use the full functionality of this web site, JavaScript needs to be turned on.
For best results, use the Firefox browser..
Copyright © 2003-2017 - Tersus Software Ltd., All rights reserved. Terms of Use License Graphic design by EmaraDesign